Confirm Proper Operation - Kohler 7726 Serie Guia De Instalacion

Ocultar thumbs Ver también para 7726 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

15. Confirm Proper Operation
Installation Checkout
Verify all electrical connections.
Turn on the power to the GFCI outlet for the blower.
Verify the tubing from the air switch is connected to the blower.
Operating Sequence
NOTE: If you encounter problems with the operating sequence, refer to the "Troubleshooting" section in
the homeowners guide.
Close the drain and fill the bath to at least 2" (51 mm) above the airjets.
Press the air switch to activate the airjets. Air will flow at its highest speed.
Verify that the blower starts and operates without excessive noise or vibration.
Verify that air is flowing from each airjet.
After 5 minutes, check the pipe connections for leaks. Repair any leaks.
Press the air switch twice, cycling through the medium and low speeds.
Press the air switch again to turn off the blower. Verify that the blower stops.
Drain the bath.
Sterling
Air Switch
19
1139487-2-F

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

7727 serie7728 serie7730 serie7731 serieSterling 1139487-2-fSterling 7726 serie ... Mostrar todo

Tabla de contenido