OVE SHELBY 60 Manual De Instrucciones página 12

Ocultar thumbs Ver también para SHELBY 60:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Place the glass panel clamp (X) into the fixed glass panel (L), mark the hole's place and make a hole in the
base using ø3mm (1/8in) drill bit.
2. Secure the glass panel clamp (X) using screw (BB).
3. Completely install the glass panel clamp (X) using 4mm Allen key.
4. Insert the fixed panel vertical seal strip (J) into the fixed panel (L). Cut the surplus part for the hinges.
5. Drill the fixed panel (L) with Φ 3mm (1/8in) in 3 places.
6. Secure the fixed panel (L) with fittings (GG), screws (AA) and caps (HH).
1
X
L
Φ 3mm
1/8in
3
X
5
Φ 3mm
1/8in
L
DOOR PANEL INSTALLATION
Helpful Hint
Add a drop of
silicone in the
holes before
inserting the
screws
12
2
X
BB
4
L
J
6
L
AA
GG
HH

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

667453827126

Tabla de contenido