Thetford SANICON TURBO 700 Manual Del Propietário página 4

Ocultar thumbs Ver también para SANICON TURBO 700:
Tabla de contenido

Publicidad

Operation, cont'd.
Empty Gray Water Tank(s)
Refer to the Fig. 1.
1. Ensure universal nozzle (
dump station! Refer to "Attach to Dump Station" proce-
dure.
TIP: For cleaner storage emptying the black water
NOTICE
tank fi rst allows gray water to cleanse the system.
2. Open gray water tank gate valve (
3. Turn pump on.
4. Do not leave unit unattended.
TIP: The hose expands as fl uid moves to dump
NOTICE
station and contracts when tank is empty.
5. Turn pump off.
6. Close gray water tank gate valve
7. Repeat Steps 2-6 for secondary gray tanks.
Gray water bypass is possible if the discharge
NOTICE
plumbing does not fl ow upward.
Prepare Hose For Storage
Refer to the Fig. 1.
1. Ensure pump is off.
2. Empty hose (
) by holding at a sloped angle to direct
F
excess water into the dump station.
TIP For Faster Draining: Leave gray gate valve
NOTICE
open allowing hose to vent and expediting the
(M)
process.
3. Disconnect nozzle (
G
4. Install cap(s) (
).
H, I
5. Return hose to coach hose compartment (
hose connected to coach.
Helpful Hints
Empty the black water fi rst. Use gray water to rinse
the hose after emptying the black water.
Additional hoses can be purchased from Thetford and
used to extend the length of the evacuation hose.
Connect the hoses using 1.5 in. (3.8 cm) barbed
coupling with clamp.
If you wish to extend the discharge hose, connect a
0.75 in. (1.9 cm) inner diameter garden hose to the
end of the nozzle. Do not extend the hose beyond
150 ft. (45 m).
A longer discharge hose reduces fl ow rate.
NOTICE
Make sure the discharge hose is completely empty
before storing.
97515 Rev. F (07/03/2019)
) is securely attached to
G
).
M
.
(M)
) from dump station.
); leave
J
Gray water bypass is possible if the discharge
NOTICE
plumbing does not fl ow upward.
Obstruction Removal
Dismantling the system can potentially cause the
NOTICE
need for new O-ring. Be sure to have a #238 Buna
N O-Ring (1x) on hand before following the steps
below. Service kits are available for purchase
directly from Customer Service.
1. Ensure all contents have been drained from system.
If manual over-ride (
bayonet cap, and open gate valve (
contents.
Be sure to have container available for capturing
NOTICE
system fl uid!
2. Locate pump impeller access cover (
(6x).
3. Remove obstruction from impeller housing (not shown)
located above (
).
E
Do NOT remove pump lower housing. Obstruction
NOTICE
AVISO
CAUTION
AVIS
!
MUST be removed through impeller inlet.
4. Replace the o-ring, pump impeller access cover, and
screws. Service Kit comes with all new parts needed to
reassemble.
NOTICE
AVISO
AVIS
!
CAUTION
Install screws in star pattern. Do NOT exceed 20 in.
lb. torque.
5. Ensure manual over-ride bypass gate valve (
closed; reattach bayonet cap.
6. Operate system using gray water; check for leaks.
Manual Over-ride (Optional)
Optional installation. May not be installed on your
NOTICE
unit.
1. Locate manual over-ride connection (
net cap.
2. Connect 3 in. sewer hose (not supplied): one end to
(
), other end to dump station.
K
3. Open manual over-ride gate valve.
4. Open black water gate valve; allow contents to drain.
5. Close black water gate valve.
6. Open gray water gate valve; allow contents to drain.
7. Close gray water gate valve.
8. Close manual over-ride gate valve.
9. Disconnect and clean sewer hose.
10. Install manual over-ride bayonet cap (
4
) has been installed, remove
K
) to drain system
M
); remove screws
E
); remove bayo-
K
).
K
®
SANICON
Turbo - Model 700
) is
M

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido