LG Goldstar GWHD6507R Manual Del Propietário página 14

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
_k
aution: During the following
step, hold unit firmly until window sash
is lowered to top channel behind side panel frames. Personal injury or
property damage may result if unit falls from window.
1 Install the air conditioner in the window
1-1. Carefully lift the air conditioner and
slide it into the open window. Make
sure the bottom guide of the air
conditioner drops into the notches of
the L bracket.
: When the air conditioner drops
into the L bracket, the air conditioner
will be centered in window opening.
1-2. While steadying the air conditioner,
carefully bring the window sash
down behind the upper guide of the
air conditioner.
When the air conditioner is properly
installed, it should tilt slightly down at
the back. If it is set correctly in the
window, it will hang lower in the back
automatically. If it does not, there is a
problem with the installation.
2. Secure the guide panels
Extend the guide panels (Type F) to
fill the window opening using 4
screws (Type B) to secure them.
3. Install the sash seal and sash lock
3-1. Cut the sash seal (Type E) to the
window width. Stuff the sash seal
between the glass and the window
to prevent air and insects from
getting into the room.
3-2. Fasten the L bracket using a screw
(Type A).
3-3. Remove the screws that secure the
cabinet and base pan in the right
side.
Window Frame
Upper Guide
Guide
L Bracket
L Bracket
Sash Seal
(Type E)
14
Room Air Conditioner

Publicidad

Tabla de contenido
loading

Tabla de contenido