LIFT CORPORATION Sht. 15 of 56 DSG#
NOTE: Ensure pressure release valve
is closed (turn clockwise) before
attempting to raise platform.
23. Close needle valve by turning knob
fully clockwise (FIG. 15-1). Then, close
hand pump release valve, by
turning valve clockwise with handle.
© MAXON Lift Corp. 2017
M-15-13
CLOSING NEEDLE VALVE & HAND PUMP
RELEASE VALVE
FIG.
Rev. C Date: 12/13/17
15-1