B&G 3FD Manual Del Usuario página 5

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

installation
3fd (remote digital repeater) Installation
T O P
When installing the 3fd display, ensure correct
orientation with the connector block on the left-hand
side when the unit is viewed from the rear.
Note: If the Unit is to be Mast-mounted, a grommet
2
must be fitted to prevent the FastNet
cable from
chaffing on the surrounding structure.
panel mounting
A hole must be cut in the panel using the template
supplied. Peel the protective backing from the
adhesive surface of the sealing gasket and fit the
gasket in position. Locate the 3fd display unit into the
hole you have cut, place the four screws in the fixing
holes and tighten. Clip on the snap-on bezel with the
arrow (on the rear face of bezel), pointing upwards.
Note: The sealing gasket should be placed between
the display and bulkhead to prevent moisture
penetration and reduce the effects of any vibration
transmitted through the instrument panel.
www.bandgservice.co.uk
+44 (0)1590 689699

Publicidad

Tabla de contenido
loading

Tabla de contenido