Glacier bay FW6AC012CP Guía De Instalación Y Cuidado página 8

Ocultar thumbs Ver también para FW6AC012CP:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
9
Attaching the quick connecting
hose
Remove the cap from the quick connect hoses.
Attach the quick connecting hose (J)
connections to the hot faucet handle (B)
connection, faucet body (A) connection, and
cold faucet handle (K) connection. Push until
the connections snap together.
Pull down moderately to ensure the connection
has been made.
A
B
K
J
10
Connecting the supply lines
Use 1/2 in. I.P.S. faucet connections (1), or a
3/8 in. O.D. ball-nose riser (2) with supply line
coupling nuts (3) (not included).
Use two wrenches to tighten the connections.
Do not over tighten or torque the copper
supply line.Pull down moderately to ensure the
connection has been made.
1
8
2
3

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido