7
7B
7A
7C
7E
7D
7 VALVE BODY PREPARATION
Attach Mounting Nut (7A) and Square Mounting Washer (7B) onto Valve Shank (7C).
Attach one end of Short Flex Tubes (7D) to the Valve Outlets (7E).
8
8J
8H
8G
8E
8D
8C
8B
8A
8F
8K
HOT
5
1
/
"
8
(41 mm)
8 VALVE INSTALLATION
This unit can be installed using either a round or square Flange (8H or 8L). From below
Bidet Fixture, insert Valve Bodies (8A) through Mounting Holes (8B). Hot water supply
line goes to hot inlet fitting indicated by Red Tag (8K). From above fixture, place Rubber
Washer (8C) and Mounting Washer (8D) onto Valve Shank (8A). Screw on Metal Lock
Nut (8E) and secure by tightening with Mounting Nut (8F) from underneath Bidet Fixture.
Place Plastic Flange (8G), and Trim Flange (8H) over Valve Shank (8A). Secure them
by screwing Plastic Lock Nuts (8J) onto the Valves.
CAUTION: Adjust and tighten Lock Nuts (8F and 8E) until the stem height is
5
about 1
/
" (41 mm).
8
7C
7B
7D
7A
8L
8B
8B
8A
8F
COLD
HOT
COLD
ENGLISH
9
9B
9 REVERSING STEM ROTATION (IF DESIRED)
Grasp the Clip (9A) and pull to remove from Stem (9B). Lift the Stop (9C) off of Stem,
flip it over and aligning the Stop with the Stem, drop Stop back onto Stem. Secure the
Stop (9C) by returning Clip (9A) into groove of Stem (9B). Replace the handle.
10
10A
10 HOSE CONNECTION TO DIVERTER
Apply PTFE Plumber's Tape to all threaded areas per manufacturer's instructions.
Connect the other end of each Short Flex Tube (10A) to one of the Inlets (10B) on Main
Diverter (10C). Hand tighten both connections.
11
11G
11 SPRAY INSTALLATION
This unit can be installed using either a round or square Spray Head (11A or 11G). From
above fixture, insert Spray Head (11A) through Washer (11B), into Hole (11C). From
underneath, assemble Rubber Washer (11D), Metal Washer (11H) onto Spray Tube
(11E) and securely tighten Nut (11F) with wrench.
3
9C
9A
9B
9A
10C
10B
11C
11A
11E
11B
11C
11D
11F
11H
9A
9C
10A