BLACK&DECKER Price Pfister KENZO 23 Serie Manual De Instrucciones página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

12
12B
12C
12A
12 SPRAY HOSE INSTALLATION
Applying PTFE Plumber's Tape to threaded areas, connect one end of Spray Hose
(12A) on Main Diverter (12B) and the other end to Spray Tube (12C).
13
13F
13B
13A
13C
13D
13E
13 LIFT ROD INSTALLATION
This unit can be installed using either a round or square Flange (13B or 13G). Place
Rubber Washer (13A) and insert Flange (13B) through the Pop-Up Hole (13C) on the
fixture. From below, attach Washers (13D) onto threaded tube and secure with Nut (13E).
Tighten against the bottom of fixture snugly. Insert Lift Rod (13F) into flange hole.
13C
13G
ENGLISH
14
14B
14A
14 WATER SUPPLY CONNECTIONS
Connect water Supply Lines (14A) to Valve Inlets (14B). (Supply lines and fittings are not
included.) Please follow manufacturer's instructions when installing supply lines.
DRAIN BODY INSTALLATION
15
15 FULL INSTALLATION AND POP-UP INSTALLATION
Be sure all connections are properly secured. Install and adjust Pop-Up (15A) using separate
instructions supplied with Pop-Up Assembly.
16
16 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
4
COLD
HOT
15A
14B
14A

Publicidad

Tabla de contenido
loading

Tabla de contenido