GreenWorks Pro ST60L00 Manual De Propietario página 19

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

OPERATION
5.
When installing new line on an existing spool, hold the spool as shown.
6.
Bend the line at the midpoint and insert the bend into the slot in the center rim of the spool.
Ensure line snaps into position in the slot.
7.
With your finger between the lines, wrap the lines evenly and firmly around the spool in a
clockwise direction.
8.
Position the lines in the guide slots.
Slot
19
Fig. 11.2
Fig. 11.3
Fig. 11.4

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido