Top frame 800, 1000, 1200 l (square model)
1. Remove lift pins from sprayer.
2. Bolt top frame to upper lift pin holes.
Note the spacer is to be fitted behind the tank contents indicator.
3. Fit the top pin.
4. Recheck the P.T.O. shaft and shields are long enough for safe
operation.
Top frame for welding to implement
General guidelines
1. If the implement "tower" is simple or small, it is best to remove it.
2. Attachment should be at the 3 apexes (
by giving maximum stability.
3. When attaching to heavier implements, weld ribs R over lower part
of top frame to strengthen it. The ribs should be allowed to follow
through for attachment to the implement.
4. The necessary attachment area along with minimum height of the
top frame is shown with the dash-point line. This must be clear.
Relocation of levers may be necessary.
R
) of the top frame, there-
R
7