5. Top frame should be at 90° to
ground.
6. If the implement has a P.T.O.
shaft, remember to recheck the
shaft length after the top frame
is attached.
NOTE: Full responsiblilty in
application and use of this top
frame and implement it is attached
to rests solely on the retail pur-
chaser. If the application is
doubtful, we recommend that the
relevant implement supplier or manufacturer be contacted.
Operation
Attachment
1. Adjust top bar so that A-frame can come in under top frame.
Beware of P.T.O. shaft.
2. Back up to sprayer and whilst adjusting top bar, lift A-frame.
3. Sink sprayer to check whether it is locked on to A-frame.
Demounting
1. Sink sprayer whilst adjusting top bar.
2. When sprayer just touches the ground, pull on rope to release lock.
3. Drive away when A-frame is completely clear of top frame.
Maintenance
Lubrication
8
2
1
Top frame
1
x
2
A-frame
40
x
40