For commissioning, proceed as indicated in the sequence below.
- Slowly fill the system and vent the air present inside it.
- Start the system.
- Before entrusting the system to the final user or to the manager, the
installer must make sure that all connections and pipes are sealed
and that all control elements work correctly. In addition, he/she must
explain tank and system functions and management, referring to this
instruction manual.
6. Operation
The maximum operating temperature and pressure values are written on
the labels/technical sheets attached to the product.
7. Disposal
At the end of the product life-cycle its metallic components
should be handed over to operators authorised to collect
metallic materials for recycling purposes, while non-metallic
components should be handed over to operators authorised
to dispose of them. If disposed of by the end customer, the
products must be managed as urban waste and therefore in compliance
with the municipal regulations of the relevant municipality. In any case
they should not be managed as household waste.