Descargar Imprimir esta página

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

All manuals and user guides at all-guides.com
P
-U
P
OWER
P
ROCEDURE
The system power-up procedure may vary depending on the re-
quirements of your Point-of-Sale (POS) system. It is always a good
idea to power-down (switch off) all equipment prior to connecting
cables. Check with your system supervisor and/or refer to the
terminal operator's manual for proper power-down and power-up
procedures for your system.
1.
Disconnect power from the scanner (if connected).
2.
Power-down your terminal.
3.
Connect the scanner interface cable to your POS
terminal.
4.
Connect the scanner's power supply to an AC outlet.
If your scanner uses the power-off-terminal (POT)
feature, this step is not necessary.
5.
Power-up the terminal.
6.
Verify that data is being properly communicated
between the scanner and your POS terminal by
scanning a few items.
You have completed the scanner installation and power-up proce-
dures. If problems occur, follow the procedures titled Problem
Isolation on the next page.
If you want to modify the scanner's interface parameters or change
the user interface (e.g. tone and volume), order the SP* ACE Program-
ming Guide (PSC Part Number R44-1140).
20
SP*ACE User's Guide

Publicidad

loading