Descargar Imprimir esta página

Publicidad

Enlaces rápidos

Enercept FLEX
E20 Series
TM
1
1. The CE mark indicates RoHS2 compliance. Please refer to the CE Declaration of Conformity for additional
details. / La marca CE indica cumplimiento de la RoHS2. Para información adicional, consulte la Declaración
de conformidad con CE. / Le marquage CE indique la conformité RoHS2. Pour plus de détails, veuillez vous
reporter à la Déclaration de conformité CE. / CE认证标志表示符合RoHS2标准。更多详情,请参阅《欧盟
符合性声明》(CE Declaration of Conformity)。
2
Regulatory Information / Información reglamentaria / Informations réglementaires / 法规信息
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
This product must be installed inside a suitable fire and electrical enclosure.
• Follow safe electrical work practices. See NFPA 70E in the USA, or applicable local codes.
• This equipment must only be installed and serviced by qualified electrical personnel.
• Do not use this product for life or safety applications.
• Do not install this product in hazardous or classified locations.
• Read, understand and follow the instructions before installing this product.
• Turn off all power supplying equipment before working on or inside the equipment.
• Product may use multiple voltage/power sources.
Disconnect ALL sources before servicing.
• Use a properly rated voltage sensing device to confirm that power is off. DO NOT depend on this product
for voltage indication.
• Current transformer secondaries (current mode) must be shorted or connected to a burden at all times.
• Products rated only for basic insulation must be installed on insulated conductors.
• Replace all doors, covers and protective devices before powering the equipment.
• The installer is responsible for conformance to all applicable codes.
Failure to follow these instructions will result in death or serious injury.
A qualified person is one who has skills and knowledge related to the construction and operation of this
electrical equipment and installations, and has received safety training to recognize and avoid the hazards
involved. NEC Article 100
If this product is used in a manner not specified by the manufacturer, the protection provided by the product
may be impaired. No responsibility is assumed by the manufacturer for any consequences arising out of the
use of this material.
For use in a Pollution Degree 2 or better environment only. A Pollution Degree 2 environment must control conductive
pollution and the possibility of condensation or high humidity. Consider the enclosure, the correct use of ventilation,
thermal properties of the equipment, and the relationship with the environment.
Provide a disconnect device to disconnect the meter from the supply source. Place this device in close proximity to the
equipment and within easy reach of the operator, and mark it as the disconnecting device. The disconnecting device shall
meet the relevant requirements of IEC 60947-1 and IEC 60947-3 and shall be suitable for the application. In the US and
Canada, disconnecting fuse holders can be used. Provide overcurrent protection and disconecting device for supply
conductors with approved current limiting devices suitable for protecting the wiring.
Z207085-0B
DANGER
E20 Series compact power and energy meters (uni-directional, bi-
directional, Modbus and BACnet). To download the Modbus Point Map,
BACnet Object List, Configuration Tool and additional documentation,
visit www.veris.com.
E20 Series Medidores compactos de potencia y energía Serie E20
(unidireccionales, bidireccionales, Modbus y BACnet). Para descargar
el mapa de puntos Modbus, la lista de objetos BACnet, la herramienta
de configuración y documentación adicional, visite www.veris.com.
Série E20 compteur d'énergie et de puissance compacte (uni-directionel,
bi-directionnel, Modbus et BACnet). Pour télécharger Modbus Point
Map, la liste d'objets BACnet, l'outil de configuration ainsi que la
documentation supplémentaire, visitez www.veris.com.
E20 系列 紧凑型电力电能表(单向、双向、Modbus和BACnet协议)。
如下载Modbus Point Map、BACnet Object List、Configuration Tool和其
他文件,请访问www.veris.com。
1
TM
A
RJ-45 connector, strain relief connector, jumper. / Conector RJ-45, conector con
alivio de tensión, puente. / Connecteur RJ-45, connecteur bloc-câble, cavalier. /
RJ-45
Control system design must consider the potential failure modes of control paths and, for certain critical control functions,
provide a means to acheive a safe state during and after a path failure. Examples of critical control functions are emergency
stop and over-travel stop.
LOSS OF CONTROL
• Assure that the system will reach a safe state during and after a control path failure.
• Separate or redundant control paths must be provided for critical control functions.
• Test the effect of transmission delays or failures of communication links.
• Each implementation of equipment using communication links must be individually and thoroughly tested for proper
operation before placing it in service.
Failure to follow these instructions may cause injury, death or equipment
damage.
1
For additional information about anticipated transmission delays or failures of the link, refer to NEMA ICS 1.1 (latest
edition). Safety Guidelines for the Application, Installation, and Maintenance of Solid-State Controls or its equivalent in your
specific country, language, and/or location.
FCC PART 15 INFORMATION
NOTE: This equipment has been tested by the manufacturer and found to comply with the limits for a class A digital
device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against
harmful interference when the equipment is operated in a commercial environment. This equipment generates,
uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction
manual, may cause harmful interference to radio communications. Operation of this equipment in a residential
area is likely to cause harmful interference in which case the user will be required to correct the interference at
his own expense. Modifications to this product without the express authorization of the manufacturer nullify
this statement.
A
WARNING
1
1/12

Publicidad

loading

Resumen de contenidos para Veris Enercept FLEX E20 Serie

  • Página 1 (unidireccionales, bidireccionales, Modbus y BACnet). Para descargar el mapa de puntos Modbus, la lista de objetos BACnet, la herramienta de configuración y documentación adicional, visite www.veris.com. Série E20 compteur d’énergie et de puissance compacte (uni-directionel, bi-directionnel, Modbus et BACnet). Pour télécharger Modbus Point Map, la liste d’objets BACnet, l’outil de configuration ainsi que la...
  • Página 2: Pérdida De Control

    Regulatory Information / Información reglamentaria / Informations réglementaires / 法规信息 El diseño del sistema de control debe considerar los posibles modos de falla de las rutas de control y, para ciertas funciones PELIGRO críticas de control, debe proveer un medio para alcanzar un estado seguro durante y después de cada falla en la ruta. Dos ejemplos de funciones de control críticas son la parada de emergencia y la parada durante el recorrido.
  • Página 3 Regulatory Information / Información reglamentaria / Informations réglementaires / 法规信息 • • NFPA 70E • • • • • • • • • • • NEMA ICS 1.1 • • • • 15部分 : 信息 (FCC) IEC 60947-1 IEC 60947-3 Dimensions / Dimensiones / Dimensions / 尺寸...
  • Página 4 Mounting / Montaje / Fixation / 安装 DIN rail mount / Screw mount / Montaje para riel DIN / Montaje de tornillo / Montage sur rail DIN / Montage par vis / DIN导轨安装 螺钉安装 Strap Tunnel/ Túnel de correa/ Tunnel de la barrette/ Wiring / Cableado / Câblage / 接线...
  • Página 5 Wiring / Cableado / Câblage / 接线 The following symbols are used in the diagram on the next page. / Los siguientes símbolos se usan en el diagrama de la página siguiente. / Les symboles suivants sont utilisés dans le schéma présenté...
  • Página 6 Wiring / Cableado / Câblage / 接线 Make fusing, disconnecting means, and voltage connections as indicated in the diagram. Select the section applicable to your meter from the column at left. Haga las conexiones de fusibles, medios de desconexión y voltaje como se indica en el diagrama. Seleccione la sección aplicable a su medidor en la columna de la izquierda. Installez les fusibles, les dispositifs de déconnexion et les raccordements d’alimentation comme indiqué...
  • Página 7 Point Map and BACnet Object List. All o configure usando el mapa de puntos configurez vous-même en utilisant la available at www.veris.com Modbus y la lista de objetos BACnet. carte de points Modbus et la liste d’objets Disponible en www.veris.com. BACnet. Disponibles sur www.veris.com Z207085-0B 7/12...
  • Página 8 User Interface / Interfaz del usuario / Interface utilisateur / 用户界面 Meter Status / Estado del medidor / État de compteur / 电能表状态 Meter is transmitting. Normal operation. El medidor está transmitiendo. Le compteur est en cours d’émission. Operación normal. 电能表正在传输。...
  • Página 9 Specifications / Especificaciones / Caractéristiques techniques / 规格 MEASUREMENT ACCURACY PRECISIÓN DE LA MEDICIÓN PRÉCISION DE MESURE 测量精度 • Real Power and Energy, 1/3 Volt Current • Potencia real y energía, modo de • Puissance d’entrée et énergie, 1/3 Volt •...
  • Página 10 Troubleshooting / Resolución de problemas / Dépannage / 故障排查 Problem Cause Solution LEDs do not light. Meter is not receiving adequate power. Verify that the meter has the required voltage between phase A and B voltage inputs. Verify the Status LED is blinking green. Check the fusing.
  • Página 11 Troubleshooting / Resolución de problemas / Dépannage / 故障排查 Problème Cause Solution Le voyant LED ne Le compteur ne reçoit pas l’alimentation Vérifiez que la tension arrivant au compteur entre les entrées A et B est correcte. s’allume pas. appropriée. Vérifiez que le voyant LED d’état clignote en vert. Vérifiez le fusible.
  • Página 12 © 2015 Veris Industries Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Veris y el logotipo Veris ‘V’ son marcas comerciales o marcas registradas de Veris Industries, L.L.C. en los EE.UU. y/o en otros países. Por tanto, se reconoce que las marcas registradas de otras compañías pertenecen a sus respectivos propietarios.