Descargar Imprimir esta página

Instructions For Use; Push-Button Panel; Lift Lifting; Lift Lowering - CLAS PE 2002 Manual De Instrucciones

Publicidad

Idiomas disponibles

Idiomas disponibles

PE 2002
PE 2006

5.0 INSTRUCTIONS FOR USE

WARNING: Carefully read the indications set forth in sect. «General Safety and Accident-
Prevention Rules».
WARNING: Before carrying out any operation using the control panel, make sure that
nobody is close to the lift.

5.1 PUSH-BUTTON PANEL

The operations to be carried out using the push-button panel are:

5.1.1 LIFT LIFTING

Check that the Emergency Switch/Disconnector (19, Fig. 1) is set to «ON» (turn it, if necessary).
Press the UP push-button (21, Fig. 1) until the desired height is reached.
WARNING:
On releasing the UP push-button (21, Fig. 1), the lift carries out the AUTOMATIC BRAKING
phase; in this phase the carriages auto-matically move down until the mechanical safety
devices are engaged.
WARNING: The AUTOMATIC BRAKING function is automatically cut off when the lower edge
of the carriage (Fig. 18) is less than approxi-mately 20 cm above the floor (FCE limit switch
operation, Fig. 25). From this height to the floor, the carriages can be moved up and down by the
operator, with no automatic operation.
WARNING: Make sure to have carefully read and understood the provisions set forth in
§4.2 LIFTING OPERATION before starting a lifting manoeuvre.

5.1.2 LIFT LOWERING

Press the «DOWN» push-button (23, Fig. 1) until the desired height is reached.
On pressing the DOWN push-button (22, Fig. 1), the carriages are lifted for a short stroke,
enabling the release of the mechanical safety lock, then they go down as long as the push-
button is pressed.
WARNING: On releasing the DOWN push-button (22, Fig. 1), the lift carries out the
AUTOMATIC BRAKING phase; in this phase the carriages automatically move down until
the mechanical safety devices are engaged.
WARNING: The AUTOMATIC BRAKING function is automatically cut off when the lower
edge of the carriage (Fig. 18) is less than approximately 20 cm above the floor (FCE limit
switch operation, Fig. 25). From this height to the floor, the carriages can be moved up
and down by the operator, with no automatic operation.

5.1.3 EMERGENCY SWITCH / DISCONNECTOR/OFF

Turning Emergency Switch/Disconnector (19, Fig. 1) to 0 (OFF), lift will stop working
completely.
This operation shall always be carried out before accessing the working area under the lift.
Lift functions are enabled by turning Emergency Switch/Disconnector back to 1 (ON).
PE 2007
71

Publicidad

loading

Productos relacionados para CLAS PE 2002

Este manual también es adecuado para:

Pe 2006Pe 2007