Commissioning

4.
Commissioning

4.1 Supply pressure

4.2 Jet pressure

Model
Nominal heat load
Nominal heat output
Injector diameter for
Natural Gas LL (G25)
Natural Gas E (G20)
LPG (propane)
Gas type
- Natural Gas LL (G25)
(12,4)*
- Natural Gas E (G20)
(15,0)*
- Propane
- Butane
24
Supply pressure
The supply pressure must lie between the following values:
for natural gas:
For LPG:
The supply pressure is measured as pressure in the gas flow at the measuring
nozzle of the gas valve.
The boiler must not be started up when the supply pressures are outside the said
range. The gas supply company should be informed.
Guide values for injector pressure (full load)
BGB/WGB
Heating
kW 20,0 - 90,0 25,0 - 110,0 30,0 - 120,0 40,0 - 160,0 40,0 - 320,0
80/60°C
kW 19,4 - 87,3 24,3 - 106,8 29,1 - 115,6
50/30°C
kW 21,4 - 93,1 26,7 - 113,5 31,6 - 123,0 42,2 - 163,5 42,2 - 327,0
mm
mm
mm
12,5 - 13,5
mbar
12,5 - 13,5
mbar
mbar 14,5 - 15,5
mbar
* values in brackets: Wobbeindex WO
** at pressure at end of boiler 0 mbar, 1013 hPa, 15 °C
- min. 18,0 mbar
- max. 25,0 mbar
- min. 42,5 mbar
- max. 57,5 mbar
BGB/WGB
90
110
9,30
11,40
8,50
10,30
6,50
7,40
Guide values for injector pressure** (full load)
12,0 - 13,0
12,0 - 13,0
14,5 - 15,5
N
SGB 120
SGB 160
C/D
C/D
38,6 - 153,0 38,6 - 306,0
10,30
12,00
9,50
10,50
7,50
8,00
10,7 - 11,7
11,3 - 13,0
10,0 - 11,2
11,6 - 13,2
11,0 - 11,8
13,7 - 14,6
8,4 - 9,0
10,3 - 11,4
3
in kWh/m
7311160-04 09.20
SGB 320
C/D
12,00
10,50
8,00
11,3 - 13,0
11,6 - 13,2
13,7 - 14,6
10,3 - 11,4