Intex PureSpa SB-H20 El Manual Del Propietario página 11

Ocultar thumbs Ver también para PureSpa SB-H20:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 53
Optional equipotential bonding system
Depending on local building codes and regulations, have a qualified electrician to connect the spa
equipotential terminal with a conductor (wire) having a nominal cross-sectional area of 2.5 mm
the household equipotential terminal. (Wire not included)
Inflation
Inflate the Spa Tub Wall
1.
Take out the ground cloth (19) and spread it over the cleared area. Then spread out the spa liner over
the ground cloth and point the drain valve towards a suitable draining area.
NOTE: Spread the ground cloth with the bubbles facing down over the cleared area where you intend
to setup your spa.
2.
Flip up the control base side cover (4) to reveal the air blower inflation outlet. Pull out the latch to open
the cover, insert the hose adaptor (24) with hose and reattach the latch to the hose adaptor to secure it
in place (see drawing 2).
2
1
3.
Unscrew the air valve cap on the spa tub to reveal the stem in the
up position for inflation. Insert the other end of the inflation hose
(7) into the valve and turn to the right to lock it in position (see
drawing 3).
S AVE THESE INSTRUCTIONS
SET UP (continued)
4
3
5
(347IO) SPA ENGLISH 7.5" X 10.3" PANTONE 295U 07/08/2020
347
English
A
2
to 6mm
2
to
2
3
1
2
7
Page 11

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido