4.
Press the
button to turn on the control panel. Press the
button to inflate the spa tub wall for 8 to 10 minutes until it is firm
to the touch but not hard (see drawings 4 & 5).
IMPORTANT: Do not over inflate or use high pressure air
compressor to inflate.
5.
Press the
button again to turn it off.
6.
Replace the air valve cap back.
The cap is designed to be screwed on and off. Never exert force
as this could cause the complete internal inflation system of the
valve to come loose. See "Spa Tub Air Valve Fastening" for valve
maintenance.
NOTE: If there is a need to replace the spa tub air pressure release
valve core (23) due to wear and tear, use the included wrench (22) to
unscrew the core from the valve base. Insert the replacement core and
tighten with the wrench. Make sure the core is securely tightened (see
drawing 6).
Inflate the Spa Cover Air Bladder
1.
Open the inflation valve and insert the inflation hose (7) into the
valve; press
to inflate until it is firm to the touch but not hard
(see drawing 7).
2.
Disconnect the inflation hose (7) from the air blower inflation outlet
and the valve.
3.
Replace the control base inflation latch back; close and recess the
inflation valve.
NOTE: If there is a need to add some air to the spa tub wall or spa
cover air bladder after they have been setup, refer to above "Inflate the
Spa Tub Wall" and "Inflate the Spa Cover Air Bladder" sections. The cover air bladder is preinstalled inside
the spa cover. If it needs to be reinstalled, place the uninflated air bladder inside the spa cover lip before
inflating the bladder.
S AVE THESE INSTRUCTIONS
(347IO) SPA ENGLISH 7.5" X 10.3" PANTONE 295U 07/08/2020
SET UP (continued)
IMPORTANT: To prevent damage to the air blower motor never
block the air blower outlet opening during inflation.
English
23
22
7
Page 12
347
A
4
5
6
7