Zoeller QWIK JON ULTIMA 202 SYSTEMS Instrucciones De Instalación página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 4
1)
Position the pump unit a minimum of 1/8" (3 mm)
from the wall with the inlet facing forward. Attach
the bellows to the inlet using the worm drive clamp
provided.
2)
Place the toilet in front of pump unit aligning the
discharge of the toilet with the inlet of the pump
unit. Make sure that the bellows will bridge the gap
adequately for final installation. The toilet tank should
be a minimum of 1/2" (13 mm) from the wall.
14-3/8"
(365 mm)
20" (508 mm)
STEP 5
1)
Installing the grinder unit behind a wall will require
an extension kit (P/N 10-2123) sold separately.
2)
Place the toilet assembly a minimum of 1/2" (13 mm)
from the wall and mark the closet bolt locations on
the floor.
3)
Measure the appropriate length of 3-1/2" (DN95)
Schedule 40 PVC pipe provided with the extension
kit and cut it to length. See sketch at right.
4)
Set toilet aside.
Toilet assembly is top heavy. Take special
CAUTION
precautions to ensure that toilet does not tip over and
break.
Rough-in (stand-alone installation)
31-1/2"
(800 mm)
Rough-in (behind-the-wall installation)
© Copyright 2017 Zoeller
3)
Lightly mark the locations of the pump unit, toilet
and closet bolt locations on the floor. Lightly mark
the wall with the height of the pump unit and the
bottom and sides of the toilet tank to ensure against
interference from pipe runs later.
4)
Remove the toilet from the pump unit and set it
aside.
17-1/2"
(445 mm)
SK2592
Co. All rights reserved.
®
8
SK2590
SK2634

Publicidad

Tabla de contenido
loading

Tabla de contenido