Technical Data; Charging Procedure - Yamato CD 12 L Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TECHNICAL DATA

CD 12 L
Model
Code
99360
Voltage
12 volt
Battery Type
Ioni di litio
Battery Capacity
1,5 Ah
Charger voltage
230V-50Hz
Speed
2
No Load speed (rpm)
0~350/0~1350
Impact rate (bpm)
-
Torque settings
18 + 1
Max Torque
20 Nm
Chuck
10 mm
Impact
NO
Charging time
1 h
Sound pressure level
68,2 dB(A)
(L
) dB(A)
K
pA
Sound power level (L
)
79,2 dB(A)
WA
dB(A)
K
Vibration level
1,552 m/s
Drilling
K=1,5 m/s
Vibration level
-
Impact drilling

CHARGING PROCEDURE

NOTE: Before using the tool, read the instruction book carefully.
1. RECHARGING BATTERIES
A) CHARGING THE BATTERY The battery charger supplied is matched to the Li-ion battery installed in
the machine. Do not use another battery charger. The Li-ion battery is protected against deep
discharging. When the battery is empty, the machine is switched off by means of a protective
circuit: The chuck no longer rotates. In a warm environment or after heavy use, the battery pack
may become too hot. Allow time for the battery to cool down before recharging. When the
battery pack is charged for the first time and after prolonged storage, the battery will only accept
approximately 60% charge. However, after several charge and discharge cycles the battery will
accept a 100% charge.
B) IMPORTANT NOTES FOR CHARGING THE BATTERY The battery in your new tool is not charged when
it leaves the plant. Therefore it must be charged for 1 hour before using the first time!
C) CHARGING Plug the charger plug into a suitable mains socket, and the indicator light will shoe
green. Then insert the battery pack into the charger, the indicator light will become red to indicate
CD 20 L
53841
20 volt
Ioni di litio
1,5 Ah
230V-50Hz
2
0~350/0~1250
-
19 + 1
30 Nm
10 mm
NO
1 h
84 dB(A)
=3 dB(A)
K
=3 dB(A)
pA
pA
95 dB(A)
=3 dB(A)
K
=3 dB(A)
WA
WA
1,552 m/s
2
2
K=1,5 m/s
2
2
-
thet charging is taking place.
The three green intelligent battery indicators will continue
flashing when start charging. Two indicators will flash inturn
when the capacity reach 70%. One indicator light flash when
100% charged. Three indicators will keep light when finished
charging. After a few seconds, the indicators will off.
After charging 1 hour, the battery will be fully charged, the
light will turn to green. Unplug the charger plug from the wall
socket, the tool is ready to use.
CD-X 20 L
CDP 20 L1
60445
53842
20 volt
20 volt
Ioni di litio
Ioni di litio
2,0 Ah
Non in dotazione
230V-50Hz
230V-50Hz
2
2
0~350/0~1250
0~350 / 0~1250
-
0~5250/0~18750
19 + 1
16
30 Nm
40 Nm
10 mm
13 mm
NO
SI
1 h
84 dB(A)
84 dB(A)
K
=3 dB(A)
K
=3 dB(A)
pA
pA
95 dB(A)
95 dB(A)
K
=3 dB(A)
K
=3 dB(A)
WA
WA
1,552 m/s
1,552 m/s
2
K=1,5 m/s
K=1,5 m/s
2
7,528 m/s
K=1,5 m/s
15
CDP-X 20L1
60380
20 volt
Ioni di litio
Non in dotazione
230V-50Hz
2
0~350 / 0~1250
0~5250/0~18750
16
40 Nm
13 mm
SI
84 dB(A)
K
=3 dB(A)
pA
95 dB(A)
K
=3 dB(A)
WA
1,552 m/s
2
2
K=1,5 m/s
2
2
7,528 m/s
2
2
K=1,5 m/s
2
2
CDP 20 BL
53153
20 volt
Ioni di litio
Non in dotazione
230V-50Hz
2
0~500 / 0~2000
0~7500/0~30000
21+3
65 Nm
13 mm
SI
-
84 dB(A)
K
=3 dB(A)
pA
95 dB(A)
K
=3 dB(A)
WA
1,552 m/s
2
K=1,5 m/s
2
7,528 m/s
2
K=1,5 m/s
2

Publicidad

Tabla de contenido
loading

Tabla de contenido