7. Secure the Module to the Stud Framing
CAUTION: Risk of property damage. Make sure a watertight seal exists on all drain connections.
Complete the drain installation according to the instructions packed with the drain.
If not already installed, install the supplies and shower valving at this time. See "Install the
Plumbing".
Open the water supplies and check all the connections for leaks.
Run water into the module and check the drain connections for leaks.
Drill holes in the front nailing-in flanges at 8" (20.3 cm) centers.
Then drill pilot holes in the nailing-in flanges at the side and back centers.
Add shims between the nailing-in flanges and the studs as needed to eliminate any gaps.
Secure the nailing-in flanges to the studs at the predrilled locations using #6 large-head galvanized
nails or screws. Be careful not to damage the finished surfaces when nailing.
For metal stud construction, drill the fastener holes through the nailing-in flanges and metal studs
and secure with sheet metal screws.
Nail furring 1/8" (3 mm) thick strips to the studs to shim out to the edge of the nailing-in flange.
1030528-2-B
8
Kohler Co.