Table of contents
1.1
2.1
Outdoor unit...............................................................................
2.1.1
3.1
3.1.1
4.1
Opening the units ......................................................................
4.1.1
4.2
4.2.1
4.2.2
4.2.3
4.2.4
4.3
4.3.1
4.4
4.4.1
4.4.2
4.5
4.5.1
4.5.2
4.5.3
4.6
4.6.1
4.7
4.7.1
6.1
6.2
1
About the documentation
1.1
About this document
Target audience
Authorised installers
Documentation set
This document is part of a documentation set. The complete set
consists of:
▪ General safety precautions:
▪ Safety instructions that you must read before installing
▪ Format: Paper (in the box of the indoor unit)
▪ Heat pump module installation manual:
▪ Installation instructions
▪ Format: Paper (in the box of the indoor unit)
▪ Gas boiler module installation manual:
▪ Installation and operation instructions
▪ Format: Paper (in the box of the gas boiler unit)
EVLQ05+08CA
Daikin Altherma hybrid heat pump - outdoor unit
4P344906-1D - 2020.10
▪ Outdoor unit installation manual:
▪ Installation instructions
▪ Format: Paper (in the box of the outdoor unit)
3
▪ Installer reference guide:
3
▪ Preparation of the installation, reference data,...
3
▪ Format: Digital files on
3
and-manuals/product-information/
3
▪ Addendum book for optional equipment:
3
▪ Additional info about how to install optional equipment
3
▪ Format: Paper (in the box of the indoor unit) + Digital files on
3
http://www.daikineurope.com/support-and-manuals/product-
information/
4
4
Latest revisions of the supplied documentation may be available on
4
the regional Daikin website or via your dealer.
4
The original documentation is written in English. All other languages
4
are translations.
5
Technical engineering data
5
6
▪ A subset of the latest technical data is available on the regional
6
Daikin website (publicly accessible).
6
▪ The full set of latest technical data is available on the Daikin
6
Business Portal (authentication required).
6
6
7
2
About the box
7
7
7
2.1
Outdoor unit
7
7
7
2.1.1
To remove the accessories from the
7
outdoor unit
8
a
b
c
1×
1×
1×
8
8
8
a
Outdoor unit installation manual
b
Fluorinated greenhouse gases label
c
Multilingual fluorinated greenhouse gases label
d
Unit mounting plate
3
Preparation
3.1
Preparing the installation site
3.1.1
Installation site requirements of the
outdoor unit
Mind the following spacing guidelines:
>250
>350
b
a
(mm)
a
Air outlet
b
Air inlet
Table of contents
http://www.daikineurope.com/support-
d
2×
b
>250
a
>250
(mm)
Installation manual
3