Descargar Imprimir esta página

Structural Layout; Prior To Commissioning - diversey TASKI foam generator 2 Manual De Instrucciones

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 42

Structural layout

1
2
1
Tank cover / dosing cup
2
Drain opening / filter
3
Hose with quick-release coupling
4
Main cord
5
Holding bar
6
Dosing control (ON / OFF switch and foam quantity
control)
7
Mixing head
(Air is mixed with cleaning solution through the mix-
ing nozzle. This generates foam)
36

Prior to commissioning

Installing the device
7
Notice:
Set the steel guide bar of the single disc
machine to vertical position, before mount-
ing the device.
• Remove the plug of the single disc machine from the mains
socket.
6
1
5
4
• Insert the power supply cord of the device into the power
socket of the single-disc machine.
3
Dosing
Attention:
Wear gloves, goggles and appropriate
(protective) working clothes when han-
dling chemical products!
Notice:
Use chemical products recommended by
Diversey only and always observe the
product information.
Caution:
Using unsuitable products (e.g. products
containing chlorine, acids or solvents) may
cause harm to health and severe damage
to the machine.
Notice:
The correct dose is specified on the prod-
uct packaging and in the "TASKI Product
information sheet".
• Position the device on the holder of
the single-disc machine and lock in
into place using the holding bar (1).
• Insert one end of the hose into the
quick-release coupling by pulling
back and subsequently releasing the
ring of the quick-release coupling.
• Mount the hose over the nipple of the
central water and spray inlet of the
single-disc machine.
Now, the hose is fixed.

Publicidad

loading