SECURE MONITOR PLATE TO ARM ASSEMBLY
B
ADJUST TILT TENSION/ POST INSTALLATION LEVEL
Adjust tilt mechanism tension with ratchet handle
lever
A3
A4
Rotate ratchet
a) Rotate handle
clockwise as far as
handle lever
possible.
clockwise for
tensioning tilt
b) Pull handle to side
mechanism.
laterally (against
For additional
spring tension) and
tension pull
rotate
lever laterally,
counter-clockwise as
rotate counter
far as possible.
clock wise and
c) Repeat steps a)
repeat and
and b) until panel
repeat tension
holds desired tilt.
10
Built-in level feature for post installation
correction
If necessary, adjust the 4 acorn nuts to
snug, not tight, tension. Slots on head
assembly are wider than bolts. This
allows monitor plate and television to
move 3.5˚ in either direction.
Secure Acorn Nut
and Washer on
Monitor Plate to
Arm Assembly
M6 Wrench
A2
M6 Washer
A3
M6 Acorn Nut
A4
A2
X2
P 11