Package contents
Part
Description
A
Lens Cover
B
Fixture Body
HarDware IncluDeD
Part
Description
AA
Toggle Bolt
BB
S Hook and Chain
CC
S Hook
The hardware kit for surface mounting is sold as a separate accessory. Please contact ETiSSL Customer Service 1-855-384-
7754 for additional information. Ordering # 54657102 (Required for surface mounting).
NOTe: Keep your receipt and these instructions for proof of purchase.
WarNiNG: RISK OF ELECTRIC SHOCK. Ensure the electricity to the wires you are working on is shut off. Either remove the
fuse or turn off the circuit breaker before removing an existing light fixture or installing the new one.
If you are unfamiliar with electrical installations, we recommend you contact a qualified electrician to do the installation.
InstallatIon
Select a suitable location that can support the weight of the fixture. Determine the method for mounting the fixture before
drilling, based on the type of ceiling.
1. With power disconnected to the electrical box, remove the existing fixture. Make a sketch of how the current fixture is wired
(by wire color) or mark the wires with masking tape and a pencil so you will know how to properly reconnect the wires to
the new LED light fixture.
A
2. Press the sides of the fixture body (B) inward, in the direction of the arrows, and remove the lens cover (A) with the other
hand.
3. After separating the lens cover (A) from the fixture body (B), unplug the wire connectors to disconnect the terminal and
ground wires.
4. Remove the safety rope from both ends of the fixture body (B).
5. Hold the fixture body (B) up to the mounting surface to determine which knock out hole to use for wiring the fixture.
surface MountIng
1. Mark two keyhole locations on the mounting surface. Using a screwdriver, punch out one of the five large knock out holes
in the fixture body (B) for wiring, based on the installation position. Drill a 1/8-in. pilot hole into the screw locations marked
on the ceiling. You can also use an awl or nail to dimple the screw holes. Install a drywall anchor (BB) and a mounting screw
(AA) in each drilled mounting hole, but do not tighten fully.
2. Feed the electrical wires from the electrical box through the center of the electrical box plate (not included). Secure the
electrical box plate (not included) to the electrcial box with the mounting screws (not included).
3. Feed the electrical wires from the electrical box through the open knock out hole in the fixture body (B).
4. Align the two mounting keyholes on the fixture body (B) with the two mounting screws (AA) in the ceiling.
5. Once the screw heads are through the large ends of the keyholes, slide the fixture body (B) to the left until the heads of the
mounting screws (AA) slide into the narrow ends of the keyholes.
6. Finish tightening the mounting screws (AA) until the fixture body (B) is tightly secured to the mounting surface.
7. Reattach the safety ropes to the fixture body (B).
8. Insert the hot and neutral (black and white) wires from the electrical box into the wire connectors of the same color wires
from the fixture body (B).
USe aNd Care GUide
Led STriP LiGhTS
B
Quantity
1
1
Quantity
2
2
AA
2
Part # ST-8-90-840-SV-N
Certification # 54599142
BB
CC
Ordering # 54599142
A
B