Installation
Dimensions
Optional Signaling System
3/4" NPT Solid Mounting Stem
18-1/2"
(470mm)
10-3/4"
(273mm)
8-1/4"
(210mm)
30"
(762mm)
Ø 9" (229mm) Flange with
(3) Ø 3⁄8" (10mm) Holes on
a Ø 8" (203mm) Bolt Circle
1
Secure Unit to Floor
NOTICE! Do not rely on the unit to support supply piping.
A
Install three suitable anchors (supplied
by installer) for 3/8" bolts in the floor.
B
Bolt the base to the floor anchors using
3/8" bolts (supplied by installer)
C
Install the pull rod to the unit as shown.
Bradley • 215-1856 Rev. D: ECO 19-05-034B
Junction Box
3/4" NPT Hub
83-3/8"
(2118mm)
(2197mm)
58-9/16"
(1488mm)
85-7/8"
(2181mm)
86-1/2"
65-5/8"
(1666mm)
34-5/16"
(872mm)
For optional foot pedal installation, the base must be
positioned so that the hole in the base is perpendicular
to the user.
4/8/2020
Top Supply
1-1/4" NPT
15-3/8"
(391mm)
Bottom
Supply
1-1/4" NPT
6" (152mm)
9-5/8"
(245mm)
23-1/8"
(111mm)
(587mm)
3/8" bolts and anchors
supplied by installer
S19-304GA
93-7/8"
(2384mm)
90-3/8"
(2372mm)
4-3/8"
5