Descargar Imprimir esta página

Cooper LXF/LXT Instrucciones De Instalación página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions – LXF/LXT
INSTALLATION
This lighting fixture has been shipped complete with one
of several mounting options. Please follow the installation
instructions specific to the catalog part that you ordered.
N
ote:
Care must be taken not to set lighting fixture down
on optical lenses or lift the fixture in the lens area.
Standard Open Fixture Installation
Tools required:
5/16" Nut driver, #10 Phillips head screwdriver, 9/16"
socket, Torque wrench.
1.
Unscrew two screws using 5/16" nut driver or #10
Phillips head driver from bottom cover plate located at
fixture base. (Figure 1.) Remove bottom cover plate to
gain access to the wiring compartment.
Figure 1.
2.
Pull electrical service leads through the pole with
sufficient length to reach through and into the wiring
compartment of the fixture. The service leads should
pass through the large, circular openings in the
mounting plate to avoid cutting or pinching the leads.
2
COOPER LIGHTING SOLUTIONS
Bottom Cover Plate
Screws (2)
IB516007EN
Installation instructions
3.
Connect service leads to the appropriate position with
the terminal block. (Figure 2.)
a.
Three-terminal block (2-wire service): Connect
line service lead to terminal that is connected to black
factory-installed wire. Connect neutral service wire to
terminal that is connected to white factory-installed
wire.
b.
Three-terminal block (3-wire service, 2 lines, 1
ground): Connect 1-line service lead to terminal that is
connected to black factory-installed wire. Connect other
line service lead to terminal that is connected to white
factory-installed wire. Connect ground service lead to
terminal that is connected to green factory-installed
wire.
c.
Three-terminal block (3-wire service, 1 line,
1 neutral, 1 ground): Connect line service lead to
terminal that is connected to black factory-installed
wire. Connect neutral service wire to terminal that is
connected to white factory-installed wire. Connect
ground service wire to terminal that is connected to
green factory-installed wire.
d.
No terminal block (3-wire service, 2 lines, 1
ground): Connect 1-line service lead to black factory-
installed wire. Connect other line service lead to white
factory-installed wire. Connect ground service lead to
green factory-installed wire.
e.
No terminal block (3-wire service, 1 line, 1 neutral,
1 ground): Connect line service lead to black factory-
installed wire. Connect neutral service wire to white
factory-installed wire. Connect ground service wire
green factory-installed wire.
Figure 2.
Terminal Block (L2)
Terminal Block (N)
Terminal Block (L1)

Publicidad

loading