Step 6: Preparing The Tank - Tru-Test WaterWell 2 Guia Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

d
Slide the water supply insulation tube over the ¾ inch flex line and vertical water supply line, making sure that the
insulation tube reaches up to the valve.
0

Step 6: Preparing the tank

a
Turn the tank on its side.
b
Apply the foam tape 1 to position 1 on the bottom of the tank, around the outside edge (recessed channel), of the hole on
the bottom of the tank (where the thermal earth tube will align).
c
Apply the foam tape 2 to position 2 on the bottom of the tank, around the outside edge (recessed channel).
d
Foam tape 3 is pre-installed under the tank top lid, and no further installation is required.
e
Finally, apply the foam tape that shipped with the reservoir lid.
f
Unscrew the WaterWell valve or disconnect it from the tank. Remove the valve mounting plate assembly by unscrewing
the three hex bolts.
g
Lift the tank and carefully place it over the vertical water supply line and ¾ inch flex line, so that the ¾ inch flex line comes
up through the tank top opening. The end of the ¾ inch flex line should be 2-3 inches above the opening. This allows
room to make connections to the valve. Excess line will be pushed back down into the tank bottom later.
11

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Waterwell 4

Tabla de contenido