IMPORTANT: Drain pan installation is for 18,000 BTU/hr, chassis height 47 inches units only.
STEP 5
Install Drain Line
Condensate line routing options are shown below. Choose the one that best suits your installation. Never run the
condensate line as shown in Option 4 below, as the drain line will come into contact with the factory-installed isolators
beneath the unit.
IMPORTANT: The drain pan and line must be kept free from debris. Prior to installing the chassis ensure that there are
no blockages in the drain pan or line.
Drain Pan Installation
Option 1
Run condensate line
to right of unit
Option 3
Run condensate line
to left of unit
5
Option 2
Run condensate line
beneath unit platform
Option 4
Do not run
condensate line
back toward unit