Kohler 7160 Instrucciones De Instalación página 2

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION
Apply a ring of plumbers putty or other sealant around the
underside of the strainer according to the putty
manufacturer's instructions. Position the flat gasket
between the drain ell and the bottom of the bath. Turn the
strainer into the drain ell.
Tighten the drain ell securely by inserting pliers handles
into the top of the strainer, as shown. Make sure the drain
ell tube is facing the front of the bath. Remove any excess
sealant.
Attach the gasket to the overflow ell, as shown. Make sure
the tapered end of the gasket is facing up.
Lubricate the O-rings on the overflow ell, and insert the
overflow ell into the tube. Align the overflow ell with the
overflow hole in the bath.
A
1010455-2-
Apply Plumbers Putty
Strainer
Gasket
Drain Ell
Fig. #2
Fig. #3
Gasket
Fig. #4
2
Bath
Overflow Ell
Tube
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

716171667160m7161m7166m

Tabla de contenido