PREPARING A NEW COUNTERTOP
USING THE CUT-OUT TEMPLATE
PROVIDED
(Included in or on the carton)
1. If template is located on the outside of
the carton cut along dotted line.
2. If template is not located on the outside of
the carton use template provided in the
carton. Measure the cutout line and
compare to all sink dimensions. The
cutout line should be 1/2" smaller than
overall sink dimension.
3. Trace on the countertop completely
around the edge of the template.
4. Drill a pilot hole inside the cutting line.
5. Using a jigsaw, cut along the inside line
to cut the opening in the countertop.
Step 3
APPLYING MOUNTING CLIPS
1. Assemble screws into the clamps as shown in Step A.
(Screws insert into clamps with a reverse thread.)
2. Locate the clamps in the position shown in Step B.
Hand tighten each clamp onto the channel so that
the clamp teeth point in the same direction as the
channel.
3. Locate the clamps uniformly around the sink
making sure to locate one in the middle of each
side. Remember only hand tighten the clamps at
this time.
Step 4
INSTALLING ACCESSORIES
Now is the time to attach your faucet and drains to
your new stainless steel sink. Use plumber's putty or
silicone sealant under the faucet base and under the
top flange of the drain to provide a leak proof seal.
1.
CUT ALONG DOTTED LINE OF
TEMPLATE PATTERN FOUND
ON SINK PACKAGING.
3.
TRACE COMPLETELY AROUND
COUNTERTOP
EDGE OF CUT-OUT TEMPLATE
2.
COUNTERTOP CUT-OUT PATTERN
4.
USING A 2" HOLE
SAW, DRILL A HOLE
ON THE INSIDE OF
THE LINE THAT WAS
TRACED USING THE
CUT-OUT TEMPLATE.
COUNTERTOP
5.
USING A JIGSAW, CUT ALONG OUTLINE
TRACED ON COUNTERTOP.
COUNTERTOP
B.
A.
SPEED
SCREW
CLAMP
TURN SPEED SCREW CLOCKWISE
TO HAND TIGHTEN
FRONT RIM
CLIP
CLIP
CLIP
INTEGRATED
INSTALLATION
RAIL
CLIP
CLIP
CLIP
FAUCET BASE
TOP FLANGE
OF DRAIN
CHANNEL