Kohler K-16232 Guia De Instalacion página 8

Grifería de lavabo de orificios separados
Ocultar thumbs Ver también para K-16232:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Spout
Aerator
6. Installation Checkout
Connect the tailpiece and P-trap (as needed).
Ensure that all connections are tight.
Remove the aerator by turning it counterclockwise.
Open the drain.
Turn on the main water supply and check for leaks. Adjust as
needed.
Open both hot and cold valves and run water through the spout
for about a minute to remove debris. Check for leaks. Turn the
faucet off.
Remove any debris from the aerator and reinstall.
1054191-2-A
8
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido