Installation; Preparing For Installation - Commercial Electric 74032/HD-G2 Guía De Uso Y Cuidado

Lámpara led de pantalla plana
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (T-Bar Ceiling)
1

Preparing for Installation

□ Prepare the wiring cover (EE) supplied in the hardwire kit.
□ Attach the conduit connector (not included).
□ Feed the building supply wires through the conduit
connector and incoming flexible conduit (not included).
NOTE: Building supply wires must be min 90°C.
NOTE: Fixture wiring compartment rated for
2in/2out #12AWG.
EE
FF
2
Securing the Panel
□ Place the Edge Lit Panel in the desired location
and secure it to the building structure using a wire
(not included). Tie the structure wires to the fixture
support wires.
WARNING: The weight of the Edge Lit Panel is not
designed to be supported by the ceiling grid. It must be
tied back to the structure. Failure to do so can cause
serious injury.
conduit
connector
3
Attaching the Mounting Plate
□ Connect the line voltage wire (black) to the building
power supply with the wire nuts (CC).
□ Connect the neutral wire (white) to the building
common with the wire nuts (CC).
□ Connect the ground wire (green/yellow) that is
attached to the back of the panel to the building
ground with the wire nuts (CC).
□ Place all of the wiring connections into the wiring
cover (EE) and attach the wiring cover (EE) to the
back of the fixture.
□ Screw in one of the wire cover screws (FF) into the
fixture and slide the wire cover slot into the screw.
□ Press the wire cover (EE) down and screw down
the other side of the wire cover (EE).
line voltage
neutral
ground
wire
4
EE
EE
FF
CC

Publicidad

Tabla de contenido
loading

Tabla de contenido