endolite Epirus Instrucciones De Uso página 8

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

8 Foot shell removal
1
Insert shoe horn behind heel spring
9 Assembly Instructions
1
Assemble toe spring onto carrier, use
Loctite 243 (926012) and torque to 35Nm.
8
35Nm
3
Cover appropriate
lines on carrier
with permanent
black marker to
leave spring set
number showing
carrier
toe spring
2
Rotate shoe horn as shown to remove shell
2
Assemble heel spring onto carrier, use
Loctite 243 (926012) and torque to 15Nm.
4
15Nm
4
Fit glide sock over the carrier assembly as shown.
7
heel spring
928017
Lubricate toe and
heel if required.
(Footshell is pre-lubricated)
938276/5-0615

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ep22l1Ep30r8Ep22l1dEp30r8d

Tabla de contenido