Product Instruction; Operation Steps; Generator Stop - TOYAMA ATS Guia Del Propietario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. PRODUCT INSTRUCTION

ATS system is designed for mains power supply off and starts generator for emergency
power supply on. When mains power supply off, the generator will start in 2-6 seconds,
and then supplies power to load. When mains power supply on, the ATS system will
automatically transfer switch to main power supply, and then stop the generator in 2-6
seconds.
- Easy installation and operation.
- Automatic working without people inspection. When transfer broken the system will
remain error record, and indicate engineer to inspect and re-setup. Don't worry about
mains power supply and generator power supply action same time.
-There is a battery charger inside, and charge the battery of generator automatically.

2. OPERATION STEPS

Use the cable to connect the ATS box to the generator control panel. For the TDG12000-
N generator, switch the electric door key to "OFF" position, for the TDG7000XP e
TDG8500 switch the electric door key to "ON" position.
2.1 Automatic Position Setup
Press AUTO button, the indicator light AUTO will be on, ATS system works
automatically.
2.2 ATS System Working
When the ATS system works automatically, if mains power supply off, ATS system will
automatically open air damper control and start the generator in 2 seconds, and wait the
generator run 5 seconds, system will switch load to generator power supply.
2.3 ATS System Start 3 Times
When generator cannot start well, ATS system will start generator circularly 3 times as
below.
Mains power supply off → generator start 2 to 6 seconds first time → start unsuccessfully
wait 5 seconds → generator start 2 to 6 seconds the second time → start
unsuccessfully → wait 5 seconds → generator start 2 to 6 seconds third time.
NOTICE: When generator cannot start successfully in 3 times, the indicator light
"FAULT" will be on.

2.4 Generator Stop

When mains power supply on again, ATS system will transfer load to mains power
supply, and generator will stop after running 5 seconds without load.
ATS SYSTEM USER MANUAL
6

Publicidad

Tabla de contenido
loading

Tabla de contenido