Switch Cabinet Assembly - Pfannenberg PWT 6402 Instrucciones De Servicio

Intercambiador de calor aire/agua de montaje superior
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 125
GB
3.4.5

Switch cabinet assembly

Figure 10 – Assembly of air/water heat exchangers with sash fasteners
Procedure
Slowly and evenly lift properly secured unit.
Assemble the air/water heat exchanger horizontally.
Permissible inclination up to 0.5° from the horizontal plane (switch cabinet + cooling unit)
 The switch cabinet should be precisely aligned.
Place the air/water heat exchanger on the roof of the switch cabinet and align it with the cut-out/seal.
Lay the condensate drain hose continuously with a gradient and without any kinks.
 The condensate drain hose must not exceed 3 m in length.
 Regularly check during operation as to whether the condensation drains off properly.
Position the air/water heat exchanger precisely in the cut-out.
Attach all sash fasteners (1) of the accessory kit to the bottom of the air/water heat exchanger, see figure
(10) Assembly of air/water heat exchangers - Detail cut-out A.
Turn all sash fasteners (1) over the roof cut-out edge and thus firmly mount the air/water heat exchanger,
see figure (10) Assembly of air/water heat exchangers - Detail cut-out B.
In case of deeper switch cabinets (over 600mm in depth), the sealing areas of the switch cabinet roof must
be reinforced (reinforcing angle / system angle from switch cabinet manufacturers).
The unit is mounted on the switch cabinet and ready for electrical connection, see
Operating Manual PWT 6402 230V / 400V 086100107 © Pfannenberg GmbH
Electrical
connection.
Page 15 / 30

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido