Uline H-1069 Guia De Inicio Rapido página 2

Selladora de mano con plegadora - 6"
Ocultar thumbs Ver también para H-1069:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

NOTE: The sealer will take approximately 10 to
15 minutes to warm up.
1. Turn the unit on by plugging it in and adjusting the
temperature dial. See Recommended Settings table
(page 3) to determine optimal temperature.
(See Figure 4)
Figure 4
2. Once the unit is warmed up, insert bag into the
mouth of the sealer and apply pressure to the foot
pedal to seal the bag. (See Figures 5 and 6)
Figure 5
3. Take pressure off
the foot pedal to
release the sealing
jaw and remove the
bag. (See Figure 7)
Figure 7
PAGE 2 OF 9
OPERATION
Figure 6
4. If not using the foot pedal, insert bag into the sealer
and squeeze the handle of the unit together. Hold to
seal the bag. (See Figure 8)
Figure 8
5. Release the handle and remove the sealed bag.
(See Figure 9)
Figure 9
6. Allow the sealer to cool down for 15 minutes
before storing.
0521 IH-1069

Publicidad

Tabla de contenido
loading

Tabla de contenido