Step 2
- Plumb track 1 (R1) to determine
the high GPR guide position.
- Drill the floor with a 6mm diameter
drill bit to set the guide in place, just
at the end of the fixed panel (PF), as
shown in the diagram.
18
Set-up of the guide to the floor
R2
R1
PF
PF
PF