Eaton CROUSE-HINDS DFLA Información De Instalación Y Mantenimiento página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

DIMENSIONS
VISOR INSTALLATION INSTRUCTIONS
1.
Remove power from luminaire.
2.
Place luminaire face up.
3.
Carefully align visor with four (4) screw holes at the top of the fixture
shown in Figure 8.
4.
Install screws provided with visor, taking care to not scratch the finish
of the luminaire. Torque to 19 in.-lbs. (2.2 N-m).
5.
Install luminaire per above instructions.
NOTE: Visor can be installed before or after luminaire has been in operation.
All statements, technical information and recommendations contained herein are based on information and tests we believe to be reliable. The accuracy or completeness thereof are not guaranteed. In accordance with
Crouse-Hinds "Terms and Conditions of Sale," and since conditions of use are outside our control, the purchaser should determine the suitability of the product for his intended use and assumes all risk and liability
whatsoever in connection therewith.
With Visor and Guard
Figure 6
With Visor Only
Figure 8
Eaton's Crouse-Hinds Division
1201 Wolf Street, Syracuse, New York 13208 • U.S.A.
Copyright
Figure 5
GUARD INSTALLATION INSTRUCTIONS
1.
Remove power from luminaire.
2.
Place luminaire face up.
3.
Carefully align guard with four (4) screw holes on each side of the fixture shown
in the image above.
4.
Install screws provided with guard, taking care to not scratch the finish of the
luminaire. Torque to 19 in.-lbs. (2.2 N-m).
5.
Install luminaire per above instructions.
NOTE: Guard can be installed before or after luminaire has been in operation.
2019
©
With Guard Only
Figure 7
IF 1798
Revision 2
Revised 10/19
Supercedes 12/18

Publicidad

Tabla de contenido
loading

Tabla de contenido