Kohler 25198-CP Instrucciones De Instalación página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2. Install the Control Box
Position the control box 11-1/2" (292 mm) minimum to 12-1/2" (318 mm)
maximum below the deck. Check the Specification Sheet for the control box
location.
Mark the location of the mounting holes.
NOTE: The provided wall anchors are for concrete wall installation. Use the
appropriate wall anchors depending on your wall material.
Drill the holes per the anchor manufacturers instructions. If using the provided
wall anchors, drill 1/4" (6 mm) pilot holes.
Attach the control box to the wall as shown.
Secure with the four screws provided.
Kohler Co.
7
1419479-2-A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-25198

Tabla de contenido