Kohler CORALAIS K-15131(M) Instrucciones De Instalación página 2

Grifos de bañera y regadera de control monomando
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ROUGHING-IN DIMENSIONS
1/2" i.p.s. and/or Direct
Sweat (four places)
1/2" i.p.s. pipe or 5/8" O.D. tubing
For slip-fit spout, tubing must extend 1-1/2" (3.8cm) min.; 2-7/8" (7.3cm) max. beyond finished
wall. For I.P.S. spout, pipe must extend 3-7/8" (9.8cm) beyond finished wall.
SUPPORT FRAMING
Determine the installation location of the valve and install support
framing as needed.
NOTE: For bath-only and shower-only installations, seal the
unused outlet with the cap provided.
3. INSTALLATION
INSTALL VALVE
Position the valve so the distance between the finished wall and the
center of the valve inlets is between 1-3/8" (3.5cm) and 2-3/8"
(6cm). Be sure the "UP" marking on the valve is facing upward.
Connect 1/2" copper tubing or I.P.S. piping to the bath and/or
shower ells.
NOTE: Do not use plastic tubing
Connect the water-supply lines.
A
1010444-2-
1/2" I.P.S. THR'D
6" (15.2cm)
1-3/8" (3.5cm) MIN.
2-3/8" (6cm) MAX.
2-1/16" (5.2cm)
3-3/4"
(9.5cm)
72" (183cm) - 78" (198cm) TO
FLOOR TYPICAL
6" (15.2cm)
W/STOPS
5-7/16"
(13.8cm)
HOT
COLD
6"
(15.2cm)
3" (7.6cm)
10"
(25.4cm)
W/O STOPS
4" (10.2cm)
TOP OF RIM
Fig. #1
72" (182.9cm)
to Floor
Plaster
Shield
Supply
Finished
Line
Wall
1-3/8" (3.5cm) Min.
2-3/8" (6cm) Max.
1/2" Pipe Thread
2
48" (122cm) TO FLOOR
(SHOWER ONLY)
Cap
10"
(25.4cm)
4"
(10.2cm)
Fig. #2
Shower
Cold
Hot
Copper
Tubing
SLIP-FIT SPOUT
CONNECTION
I.P.S. SPOUT
CONNECTION
Fig. #3
Kohler Co., Kohler, WI U.S.A.
Bath Ell

Publicidad

Tabla de contenido
loading

Tabla de contenido