WARNINGS & CAUTIONS
WARNING:
Two people are required for safe installation. Take extra precautionary
measures to ensure a secure grip on the vanity base when lifting.
CARE & MAINTENANCE
• To maintain the beauty of the furniture finish, avoid placing the vanity in direct sunlight.
• Avoid exposing the vanity to extreme temperatures by installing away from heat and air vents.
• Dust frequently with a clean, soft and dry cloth.
• Wipe away any water or liquid spills on the vanity base immediately with a clean, soft and dry cloth.
INSTALLATION
Model 30136 and 30137 shown in illustrations
1: Removing old vanity (if applicable): 1) Turn off the water supply and take the drain out. 2) Disconnect the supply lines from the
faucet. 3) Remove the old vanity top and vanity. NOTE: If the new vanity is not installed immediately, temporarily stuff a rag into the
drain pipe.
2: Using a level, locate any uneven floor and/or wall areas where your vanity will be installed. Unevenness can cause your vanity to
become misaligned resulting in twisting of the cabinet. Repair any uneven areas by reducing high spots or shimming low spots.
3: 1) Provide sufficient protection on the floor to protect the vanity from damage. Tilt the vanity backwards and attach each leg (x4) into
the pre-drilled holes of the vanity base bottom, and pressing the leg into place. To secure, insert (x4) bolts and tighten with the Allen
key. Figure 1.
For model 30137,30152, 30174 and 30210 only: Attach the centre leg by aligning its pre-drilled holes with the pre-drilled holes in the
vanity base bottom and secure by inserting and tightening (x2) bolt. Insert the leg leveler by inserting and rotating its threaded leveler
into the hole in the bottom of the center leg. Figure 2.
4: 1) Place the vanity in the desired position taking into account the location of your plumbing. 2) Ensure the vanity is level front to back
and at both sides.
5: Secure the vanity to the wall by inserting (x2) #8 x 2" screws (B - not included) through the back rail of the vanity. Figure 3. NOTE: It
is recommended that the vanity be installed to at least one wall stud. If you are unable to locate wall studs, it is recommended that you
use wall anchors (C - not included) to secure the vanity.
6: Install the hardware, vanity top, faucet and drain (each not included) as per the instruction sheets provided with those items and
ensure that there is no leakage.
Figure 1
Model 30136 shown
Figure 2
Model 30137 shown
CAUTION:
The bathroom floor and wall must be finished prior to
installation of the vanity base.
Figure 3
Model 30136 shown