Twin-Star International 23FM2590 Instrucciones De Ensamblaje página 6

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Locate Hearth/Base (A) and set out fi nished side up
on the fl oor. Insert one Wood Dowel (CC) into each
of the pre-drilled holes.
Attach the Completed Center Front assembly from
step 2 to the Hearth/Base (A). Make sure that
dowels are seated into the pre-drilled holes in
the Hearth/Base. Using Bolts (AA) and Washers
(BB) attach panels through pre-drilled holes in
the mounting blocks.
HAND TIGHTEN ONLY.
Locate Left Side Panel (E) and Right Side Panel (F),
attach to the Hearth/Base (A) using Bolts (AA) and
Washers (BB) through the pre-drilled holes in the
mounting blocks. Make sure that dowels are seated
into the pre-drilled holes in the Hearth/Base (A).
HAND TIGHTEN ONLY.
Hardware Used
AA
Bolt
BB
Washer
CC
Wood Dowel
4. Insert one Wood Dowel (CC) into each of the
pre-drilled holes on the top edges of the Assembly
from step 3. Then locate Mantel/Top (G) and lay
fi nished side up on top of completed assembly.
From the inside, attach the Mantel/Top (G) using
Bolts (AA) and Washers (BB) through the pre-drilled
holes in the mounting blocks.
HAND TIGHTEN ONLY.
Using Phillips head screwdriver tighten all Bolts
alternating top and bottom, left and right.
Hardware Used
AA
Bolt
BB
Washer
CC
Wood Dowel
5. Locate Side Back Panels (J), attach to the back of
the completed assembly from step 4. Use a Phillips
Head screwdriver, tighten screws (EE) through the
pre-drilled holes in the Back Panels to the
completed assembly.
Hardware Used
EE
Screw
Fig. 3
E
x 8
x 8
Fig. 4
x 8
x 8
x 8
x 8
Fig. 5
x 36
5
A
G
EE
J
J
F
AA
BB
CC
CC
BB
AA

Publicidad

Tabla de contenido
loading

Tabla de contenido