Descargar Imprimir esta página

Rev-A-Shelf 5322-BCSC-11-GR Manual De Instrucciones

Publicidad

Enlaces rápidos

TOOLS REQUIRED:
ESTIMATED ASSEMBLY TIME:
30 MIN
CARE AND MAINTENANCE:
Clean with a damp cloth and
wipe parts dry.
PARTS LIST
A- Frame assembly
B- Slide assembly
C- Release levers
D- Rear slide catches
E- (4) Euro screws
F- (4) #6x 5/8" Flat head screws
G- (4) #8x 3/4" Pan head screws
H- (4) #6 x 1/2" Flat head screws
(for door mounting)
FIG. 1
FIG. 1A
FIG. 2
FRONT EDGE OF PAPER TO FRONT
OF EDGE OF CABINET OPENING OR
FRONT OF FACE FRAME.
IF INSTALLING IN INSET DOOR
APPLICATION, MOVE TEMPLATE
BACK THE THICKNESS OF THE
DOOR.
8" 5322 BASE ORGANIZER
A
1) Using the mounting template locations, pre-drill (4) holes using a 3/32" drill bit.
2) Secure the slide assembly to the floor of the cabinet using (4) #8x3/4" pan head
deep thread screws.
3) Assemble release levers using (4) #6x5/8" flat head screws and rear slide catch using
(4) Euro screws (Fig. 1).
4) With the slides in the fully closed position, the pullout chassis can now be fully
inserted into the cabinet. When the unit is pushed to the fully closed position, the
front release levers will engage the slides and the unit can be fully cycled.
5) Loosen the (2) lock nuts at the back of the unit to allow the rear stop to float freely
(Fig. 2). Move the rear stop until it catches the rear of the face frame (if frameless
application, a block may need to be added to allow the stop work properly). Once
the rear stop is in the correct position, the lock nuts can be tightened and bumpers
can be added to the front of the stops.
ATTACHING THE CABINET DOOR
1) With an 8 mm wrench, loosen the (4) lock nuts located inside the front wall of the unit
(Fig. 3).
2) Adjust the door mount brackets to ensure you are mounting to the thick portion of
the cabinet door (the front of the unit should be lined up with the front of the face
frame).
3) Using (4) #6x1/2" flat head screws, attach the door to the pullout unit.
4) If the door needs to be adjusted sideways, loosen the (4) lock nuts and adjust the door (Fig.
4).
5) See (Fig. 5 and 5A) for tilt and height adjustment.
Install rub bushings using enclosed kit and instructions.
(Chassis may need to be removed for proper installation)
(or Front of Face Frame)
(4) Screw and Pilot
Hole Locations
B
C
E
F
D
G
H
Front Edge of Paper
to Front of Cabinet
12400 Earl Jones Way
Louisville, KY 40299
rev-a-shelf.com
Customer Service: 800-626-1126
FIG. 3
Lock Nut
FIG. 4
FIG. 5
FIG. 5A
FOLD ALONG DOTTED LINES TO FIT
INTO CABINET
T-5322-8-1217

Publicidad

loading

Resumen de contenidos para Rev-A-Shelf 5322-BCSC-11-GR

  • Página 1 12400 Earl Jones Way Louisville, KY 40299 rev-a-shelf.com Customer Service: 800-626-1126 8” 5322 BASE ORGANIZER TOOLS REQUIRED: (4) Screw and Pilot Hole Locations ESTIMATED ASSEMBLY TIME: 30 MIN CARE AND MAINTENANCE: Clean with a damp cloth and wipe parts dry.
  • Página 2 12400 Earl Jones Way Louisville, KY 40299 rev-a-shelf.com Customer Service: 800-626-1126 ORGANIZADOR BASE 5322 ORGANISATEUR DE L’ARMOIRE DU BAS 5322 HERRAMIENTAS REQUERIDAS: OUTILS REQUIS: (4) Ubicaciones para el Tornillo y Orificio Piloto (4) Emplacements des vis et des trous pilote...

Este manual también es adecuado para:

5322-bcsc-9-fog