Ubbink 400x670 Instrucciones De Montaje página 42

Tabla de contenido

Publicidad

Before starting the assembly, make sure that you have all the necessary parts by taking an inventory starting from
the parts list provided on page 9.
• Installation on concrete slab is mandatory and imperative for warranty validation. Thickness: 20 cm minimum.
Make sure that the slab is perfectly flat, smooth and level.
SUMMARY:
– Preparation of the concrete slab
– Wall assembly
– Bracket screwing
– Mounting of wall reinforcements
– Preparation of the walls
– Felt and liner installation
– Nozzles and skimmer cutting
– Mounting the pine coping stones
– Ladders
10
– Installation of the automatic
broom
3a – Position the brackets in the up – down direction.
3b – Draw the locations of the brackets according to their height.
3c – Draw the locations of the pre-drilling on the skimmer wall.
3d – Drill the locations of all brackets.
3e – Level the brackets and screw them until the screw heads are embedded in the wood.
3f – Attach the wooden stops for the skimmer flap.
4a – Cut the 45x135 section pole to length for the skimmer.
4b – Do the same for the discharge.
4c – Mark the location of the holes as for the reinforcements and arrange the posts.
4d – Drill the walls.
4e – Screw all beams to the wall reinforcement and embed the screw heads.
4f – Mounting principle of the cradle covers.
4g – Draw the fastenings of the cradle covers and drill the wall.
4h – Screw the reinforcements and embed the screw heads in the wall.
4i – Nail the 3 parts of the cradle cover together.
5a – Screw the skimmer vent into the upper beam using 2 round head screws to be removed from the screw bag provided in the skimmer box.
5b – Install the skimmer square outer seal and the skimmer body.
5c – Fix the assembly with the 8 round head screws to be removed from the screw bag provided in the skimmer box, tightening effectively for a good seal.
5d – Installation of the hung rails.
5e – Drill the rails to size (3 cm from the ends and then every 20 cm approximately). The rail of a wall can be composed of several segments placed end to end.
First of all, carefully clean the concrete slab and remove splinters or shavings from the walls with abrasive paper to make all supports clean
and smooth.
5f – Unwind the wall felt and place the plastic rail on top flush with the upper beam.
5g – Screw on the first rail liner.
5h – Draw the angle to be cut.
5i – Cut the corners according to the diagram. Screw all rails together
5j – Find the skimmer frame by trial and error.
5k – Cut the felt outside the frame.
5l – Proceed in the same way with the outlets and the brush socket.
5m – Seals. Place a rectangular joint on the skimmer frame, making sure it adheres well. At the outlet, place the cork seal (A) in contact with the wall and then superimpose one of the
2 white round joints (B) making sure that they adhere well.
6a – Install the protective felt for the floor.
6b – Cut the protective felt with a cutter or a pair of scissors.
6c – Put the liner in place at an outside temperature between 20 and 25°C
6d – Match the corners of the liner with the bottom corners of the pool.
6e – Hang the liner in the lip of the rail.
6f – Monitor the positioning of the liner and remove the coarser folds.
6g – Adjust the angles of the liner with those of the structure.
6h – Put in 2 cm of water.
6i – Remove folds and resubmerge up to 5 cm below the discharge nozzle.
7a – Stop the impoundment 5 cm below the discharge nozzles.
7b – Position the discharge nozzles and the brush socket from inside the pool.
7c – Cut the liner at the discharge nozzles and brush socket, leaving a gap of about 2 mm. Insert the white gaskets (B), discharge nozzles and the brush socket.
7d – Tighten the outer nuts of the delivery nozzles sufficiently to ensure tightness by means, if necessary, of the trick mentioned in the diagram. Do the same with the brush socket.
7e – Cover the threaded part of the end caps with Teflon tape in a counter-clockwise direction.
7f – Screw the end caps onto the deliveries and brush socket.
7g – Adjust the length of the rigid pipes and glue the elements together.
7h – Example of pipe positioning with vertical wall reinforcement. Close the shut-off valve.
7i – Glue the elbow, shut-off valve and 1 m hose together. Adjust the length of the pipe according to the ground configuration.
7j – Glue the previously assembled assembly to the outlet of the brush socket. Close the shut-off valve.
7k – After covering the Teflon threaded part, screw the threaded stop valve into the skimmer body.
7l – Glue the rigid PVC pipe and elbow to the stop valve. Close the valve after the gluing has set and refill the basin up to 5 cm below the skimmer.
7m – Mark the location of the skimmer joint.
7n – Install the seal and skimmer frame using the 18 flat head screws to be removed from the screw bag provided in the skimmer box.
7o – Cut the liner inside the skimmer frame. Finally, place the flange cover by clipping it into place.
7p – Correct water level at mid-height of the skimmer.
7q – nstall the finishing profiles. Be sure to leave a gap of 2 cm between the end of the finishing profile and the coping stone. Cut the profile to length if necessary. Attach the finishing
profiles using the nails provided.
8
• (see page 30)
The use of ladders must be limited to access to the pool. The maximum weight allowed is 150 kg. The means of access must be
put in a safe position when not in use.
9
9a – Retrofit the ladder. To do this, flush the air below the steps if necessary.
9b – Not all locations are possible. Refer to the tarpaulin instructions.
9c – Attach the stainless steel supports using the bolts provided in the stainless steel ladder box.
10
10a – Insert the pressure regulator into the rubber adapter. Make sure the direction is correct.
10b – Reassemble the automatic brush hose and connect it to the free end of the pressure regulator. It is important to purge it of air. Connect the assembly, while keeping it
submerged, to the broom socket. Open the shut-off valve of the brush socket and close the one of the skimmer. Switch on the pump. When the brush is not in use, close the
plug stop valve broom and open the skimmer. Refer to the automatic broom manual for more details.
1a - The minimum dimensions of the slab must be at least equal to that of the pool, including coping stones. Refer to the plan
page 10.
2 configuration cases:
1– You are not in possession of the metal cradle (waiting for delivery of the pool) during the
construction of the slab. In this case, you can prepare the concrete slab by leaving a reservation
18 cm deep and 10 cm wide. After receipt of the pool, position the metal cradle in the reservation
and fill it with concrete by respecting the level (drawing 1e).
2 – You are in possession of the metal cradle when the slab is made. In this case, drown it inside,
respecting the level (drawing 1e). Be careful to plan for a number of 1 to 3 depending on the pool
models.
Once the metal cradle(s) have been removed from the package, it is imperative to recondition the wooden structure flat on the
pallet by encircling the entirety with straps to avoid possible deformations.
1b – Position the structure in the prevailing wind; for this purpose, use the first row of beams temporarily.
1c – Assemble the horizontal cradle with the 2 vertical uprights.
1d – Positioning of the cradle.
1e – Fill the reservation with concrete.
2* – IMPORTANT: It is important that the beams are properly interlocked, especially those at the bottom
(where the water pressure will be highest). TO INTERLOCK A WARPED BEAM:
Even when packed on pallets, it is possible that some beams may be warped. This is quite
normal since wood is a living material. To assemble a warped beam, position and
snap in one on both sides of the beam. Straighten the other side with 2 wooden shims and the
clamp. Engage it with the mass and the martyr piece.
2a – Assembly principle. For this purpose, use the martyred piece for the interlocking of all the beams. The tabs being designed
to correctly align the beams when they are interlocked; their absence or small-sized breaks in no way affect the mechanical
resistance of the wood, the strength and assembly of the pool.
2b – Retrofit the first row of beams.
2c – Push on the ends of the walls to place the structure on the cradles.
2d – Check the geometry using a tape measure (10 m) and continue assembling the beams up to the 5th full row.
2e - Position the discharge beam MR (suction point) On the 6th row. It can be positioned below the lower skimmer beams.
2f – Position the MDR discharge beam opposite the skimmer in the 7th row after the lower half beam.
2g – Position the lower skimmer beam in the 8th full row. Complete the assembly of the structure by fitting all the upper beams.
Make sure that the lower and upper skimmer beams are aligned.
42

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

75247507524410

Tabla de contenido