EN
Mounting Procedures
Mounting Procedure (Center)
If the F-series video panels being used have threaded mounting holes in the center position, it is recommended to use
them instead of the threaded mounting holes in the corner positions. If the panels do not have threaded mounting holes in
the center position, see
1. Attach the F-series video panel to the rig bar panel by aligning the magnetic alignment conicals and locking the
male speego connections.
2. Insert the M12 panel attachment screws into the center-position M12 threaded mounting holes and secure with a
3 mm hex key.
The F2 and F5IP video panels have frames with a center mounting position. The F3 video panel will
need the panel attachment screw inserted at the corner of the frame. Both the F4IP and Vivid 4 have
been upgraded with center mounting position frames, and may vary depending on order date.
7
QUICK REFERENCE GUIDE
Mounting Procedure
(Corner).
M12 panel attachment screws
Video panel
Ground Support 2 Kit QRG Rev. 4