Standard Installation - Cooper LDA3B LWTPD1 Serie Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions – LDA3B*LWTPD1
WITHOUT BATTERY BACKUP
Figure 1.
INSTALLATION

Standard Installation

1.
Consult plaster frame instructions
for assemby into the ceiling.
2.
Install the smart sensor in the
ceiling ensuring adequate sensor
cable length.
a. To mount the sensor through a
ceiling tile, thread the spring arms
around the sensor and insert the
sensor through a 15/16th inch hole
in the tile.
3.
Connect sensor cable to control
unit. Connect other end to ceiling
mounted sensor. (See Figure 2).
2
PORTFOLIO
IB520078ML
Control Unit
Figure 2.
Installation instructions
WITH BATTERY BACKUP
Plug Sensor Cable Here
.820"
[20.83mm]
Ø1.260"
[32mm]
Smart Sensor
1.871"
[47 .52mm]

Publicidad

Tabla de contenido
loading

Tabla de contenido