Before Starting - Wacker G50 Manual De Operación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

G50/G70/G85

1.26 Before Starting

Before putting the generator into service, review each item on the following checklist. Because generators are often
run for long periods of time unattended, it is important to make sure that the unit is set up properly to reduce possible
problems.
Failure to follow the procedures listed may cause injury to personnel or damage to the generator. Be certain that
all persons setting up the generator are certified or fully trained on the installation of the generator.
Check for any damage that might have been caused during shipping or towing.
Check to make sure no debris has lodged in or near radiator (both sides) or fan.
Check that generator is level.
Chock trailer wheels.
Check that generator is grounded to a good earthen ground per NEC and local regulations.
Check engine oil, coolant and fuel levels, and fill as required.
Determine voltage needs. Set voltage selector switch and make correct terminal connections.
Check that all electrical connections were made in compliance with local regulations and NEC standards.
Check fan belt and hoses on engine for loose connections or fraying. Tighten or replace as required.
Close and secure side panel access doors.
Review and follow safety instructions found in the front of this manual.
All manuals and user guides at all-guides.com
WARNING
OPERATION
1A
1A-23

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido