Loading configuration
Ceiling configuration
A
Position the 2 arms horizontally and lock with the indexing
pins
B
The retractable ceiling stops should be on the top
Slanting configuration
C
Position the 2 arms vertically and lock with the indexing pins
D
The retractable slanting stops should be on the top
Small board configuration
E
Raise the slant arm to its top point to load small boards
A
B
E
Indexing
clip
Retractable
C
ceiling stop
Indexing
clip
D
Fixed
stop – slanting
Top locking
point
Operation
Place the board on the stops
Lower the handling loop
When fitting a board under a sloping surface, press the board
directly against the rails and lock the wheels
Operate the winch to raise and fix the board
To lower, check that the cable is taut (if necessary, tighten it), move
the brake
downwards and operate the winch
I
Push the locking lever
it in the loading position
5
F
to position the board horizontally
G
H
J
upwards to unlock the antenna and put
G
F
H
J
I
English
Handling
loop
Retractable
ceiling stop
Wheel with
brake
Locking
lever
Brake